The Whitman-Hanson Regional School District Transparency Project

Record page 332 of 4179.

Page 0332 of 4179

Record — Page 0332

Troy L. Randall, AIA, LEED AP Partner l Ai3 Architects, LLC On Nov 15, 2023, at 5:25 PM, "Troy Randall" ■ Hi Mike, We understand that the Town is moving expeditiously through the process of securing bonding for the proposed project and that it is important for the professional team to proceed with the design process as soon as possible, with a goal of public bidding and beginning onsite construction activities in the Spring of 2025. With this in mind, we have attached the MSBA’s most recent standard Contract for Designer Contract with all attachments and Designer signatures. The Basic Services fee, including Feasibility Study and Schematic Design, was previously provided for budget purposes as $10,646,500. As we reviewed the project scope and number of hours to complete the project in more detail, we were able to reduce the Basic Services fee to $10,457,000. This equates to a reduction of $189,500 in the Basic Services fee. This fee amount is consistent with (actually lower than) previously approved designer basic services fees associated with MSBA middle schools since 2014. We have also identified the currently known Phase II - Extra Services required to satisfy the MSBA module requirements through the completion of the construction bidding documents and Construction Administration. We have identified these Extra Services as follows: 1. Phase II: Site Surveyor 2. Phase II: Geotechnical and Environmental Evaluation 3. Phase II: Hazardous Material Inspection Services 4. Phase II: Site Permitting and Approvals Planning Board, Zoning or Regulatory Variances, Submittals, and Approvals 5. Phase II: Historic Commission Filings, Hearings, or Approvals 6. Phase II: Environmental Permitting Conservation Commission 7. Phase II: Traffic Study 8. Above Ground Storage Tank (AST) Removal Oversight 9. NPDES Permitting 10. MAAB Variance Application 11. Soil Characterization 12. Hydrant Flow Testing 13. On-Site Geotechnical Engineer During Site Excavation/Compaction/Ground Improvements (Construction Phase) 14. FF&E Design & Installation Management 15. Sustainable Design / LEED Consulting Services 16. Solar Design Engineering and Consulting Services and Analysis (development of bid Alternate) 17. Hazardous Materials Surveys, Construction Monitoring, and Air Sampling The exact scope of these Extra Services and associated fees are identified in the documents labeled “Attachment A: Extra Services Scope of Services”, “Attachment C: Participation Schedule for Designer Contracts by the SDO Office“, and “Attachment F: Contract for Designer Services – Amendment No. 1”. The proposed fee for all Extra Services (Including Phase I extra services during the feasibility study and schematic design) is $1,012,573.90. The Phase II Extra Services ONLY is $919,983.90, a fee reduction of $50,016.10 from the budget amount previously provided. The TOTAL Basic Services AND Extra Services fee for Phase I and II is $11,469,573.90. A reduction of $239,516.10 in the TOTAL fee from the budgeted amount. The attached document also includes the standard MSBA Designer Services Contract Amendment for the Design Bid Build (DBB) delivery method. If you have any questions regarding the Designer Contract or any of the provided documentation, please feel free to contact me.